Telco Engineer PT.Lintech Solutions Indonesia

Job Opportunities

Position: Telecommunication BTS & MW software commissioning engineer and supervisor.

Period of Employment: 3 months Probation, then renewal depends on the performance and ability of the employee

Job Mainly Description:

  • BTS & MW software commissioning
  • Supervise and instruct BTS & MW hardware installation
  • Troubleshooting with BTS & MW
  • Prepare the planning of site construction

Basic Requirements:

  • Male, about 23-33 years old, healthy.
  • Diploma or Bachelor or above, Major in Telecommunication, Electronics, Computer Science.
  • More than one year experience, related experience of Telecommunication
  • English is a MUST, Mandarin will be advantage.
  • Able to work under pressure and over-time, able to travel all around Indonesia.
  • Smart and skillful.

Salary:
– Negotiable

Anyone who interested please send the Applications letter (including expected salary), CV and recent photograph by email to:

Juni@gpdi.com
(Coordinator: Juni)
Assistant of Director for Lintech Solutions Indonesia)
Only short-listed candidates will be notified.

PT.Lintech Solutions Indonesia
Menara Supra, 11- I Floor .Jl . Let . jend. S Parman. kav 76 .Slipi
West Jakarta 11410

For further information of the parents company in Hong Kong and China, Please refer to: http://www.lintech.com.hk ,http://www.gztcc.com

3 Replies to “Telco Engineer PT.Lintech Solutions Indonesia”

  1. Kahar, ST

    Pengalaman : pekerja sebagai Supervisor Pembangunan BTS Indosat Pada daerah kalimantan barat, BTS Telkomsel dan XL pada daerah Sulawesi…, Saya Harap dapat dipertimbangkan…

    Terima kasih

  2. bouzayani dhaou

    Mr. Expensive Sir,
    I am BOUZIANI DHAOU, I seeking a new occasion in my work, thus I find your offer in the Web site of service of work, and I have very interesting with this last, I work with the company of ALGERIE ( SIEMENS) IVOIRY COST (ALCATEL LUCENT)SCADA COM ,KYNIE and GEENIE(ERICSSON) , HAITEK(SUDAN) in position of supervisor and manager in the GSM, my role must inspect any installation of PDH (0.3, 0.6, 1.2, 1.8), directional of omnue,bts(B7,B8,B9,B10), rbs(OMT30,OMT31,OMT32,OMT33,OMT34) ,bs(BR7,BR8,BR9,) , SDH(ADM) ,CW
    Work in tower at ALCATEL, ALCATEL AWAY(1320) and Carry BTS(B7,B8,B9,B10) (G2, G3, and G4) outdoor, installation of indoor
    MINI LINK and RBS 22x/21x and CIVIL WORK, also integration RBS with the customer (Tunisia telecom) ,(keny ,geenie)? I send my CV thus to you if you need any information want call me or send to me email;

    The post: INTEGRATOR, SUPPRVISOR, ACCEPTENCE, INSTALLATION, PLACE Of MAINTENANCE (ALCATELE, ERICSSON, NOKIA SIEMENS),
    MAINTENANCE: I work maintenance has Sudan,Ivoiry cost,Tunis curative and preventive maintenance (telecom and Tunisian)
    TRANSMISSION:
    – Measurement site master and diagnoses of measurement put in report/ratio
    – checking and pointing of the bond hertizien
    – Change of the UDU and IDU defected
    BTS:
    – Netoyage of the fun
    – Change of the TRX, CDU, MODULE ACDC
    – Measurement site master
    – Change of the connector defected
    – Control and checking of the tension and intestate
    – Measurement of autonomy of the batteries
    CIVIL ENGINEERING
    -cw (civil work maintenance)
    – Spot on BTS and transmission
    – Netoyage of site
    – Measurement of ground
    – working of ear thing
    – Gris sage of let us bolons
    – change of itenchite de the whole of connection out door
    – Intervention on standard beaconing 48v and 220v
    – checking of tilt and azimuth and HBA
    RBS SUPPERVISOR: ( omt (30.31.32.33.34))
    Installation , integrated , acceptance ( 21X , 22X)
    CW SUPPERVISOR
    KENYA AND GEENIE ERICSSON ( SCADACOM):
    SUPPERVISOR:
    2116 AND MINILINK(TRAFIC NODE) , MARCONIE
    SDH (OMS 1240, 1260..)
    Installing rack OMS, rack ODF and cabling
    Installing and alignment antenna (0.6, 1.2, 1.8)
    ODF Installing and cabling fiber optic
    DDF fixed and crooner reglete
    Ohms 1240 (LTU-BAL- 2M)
    OMS 1240 alarm IN. OUT
    OMS1240 synchrony
    Mise en service
    SUDAN : NOKIA SIEMENS (2G, 3G)
    DE (05/09/2008, NOW 2009-01-26
    Acceptante site
    Maintenance site:
    CW (civil work tested, swap antenna, upgradeā€¦)
    Test alarm
    SDH INSTALLATION
    SUDAN: NOKIA SIEMENS (2G, 3G) TRANSMESSON (SRAL, SDH (SRT1F))

    DE (05/09/2008, 20/02/2009)
    Site Acceptante
    Site Maintenance
    Test alarm
    Siemens BTSE:
    BS40, BS41, BS240, BS241
    BS240XL, BS242
    Siemens SRA4.
    Upgrade
    Measuring Site master
    Siemens TRANSMESSION (SDH, PDH(SRT1F):
    Alignment
    Integration and Running off Different Equipments
    Swap radio operator Antennas.
    Tilt and Azimuth
    Measuring site master
    Maintenance site
    Drive test

    NOKIA FLEXI WCDMA
    Installation
    Commissioning
    Integration

    Siemens BTSE:
    BS40, BS41, BS240, BS241
    BS240XL, BS242
    Siemens SRA4.
    Commissioning AND INTEGRATED BS, SRAL,SDH

    Rectifier:
    Power One, Eltek, Empower Ascom,
    Nortel, Siemens, and Harmer
    Drive test (2g, 3g)
    zinabenaidi@yahoo.fr
    zinabenaidi@gmail.com

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.